BACK

home

Burpham Futures -

Building project, phase 2


Building Project plans as shown in Church on 22nd January, 2012

On Sunday 22nd January plans were shown at CHS of the proposals for Phase 2 of our improvements.






All the drawings and plans listed in this section have been

prepared by and are copyright © of our architects: Gerry Lytle Associates.


The scale of the drawings is not indicated on these copies for the web site.


ground floor plan


first floor plan


north elevation (from New Inn Lane)


west elevation




east elevation


section through stairs


section through meeting rooms


street scene perspective

(New Inn Lane)


The Vision

We want the Church of the Holy Spirit to be :

•  A place where children and adults can learn, play and grow in faith     together in a light, attractive and child-friendly space.

• A place where older people can have easy access and comfortable    surroundings to meet one another in fellowship.

• A place with properly equipped resources so that groups can meet, and    learn and grow together in understanding.

• A place where the church family can enjoy meeting and eating together,    and welcome those who are coming into the life of the church.


These are some of the main plans, elevations and sections showing the next (second) phase of our building improvements which were submitted as part of our planning application just before Christmas.  


It is hoped that a planning decision will be reached in

mid-February.  


At the same time we need a "Faculty" approving our plans from the Church of England, and the same information has been submitted for that. We understand our proposals already have the support of the Diocesan Advisory Committee.


We have close to half the overall funding we need for these works and will continue our fund-raising after we have these approvals.


Select the drawing you wish to view from the list below

Pray for Phase 2 on Mondays


Make Monday a special day when we pray for Phase 2.

See the weekly Prayer Diary

See earlier Burpham Futures pages


Our Burpham Futures page mid 2011 with links

to Bulletins numbers 10 and 11 and 12


Bulletin No 12 (Dec 2011)


Update mid December 2011